that would be 2100…1 1/4″ drywall screws…screwed into the subfloor underlayment…by me

The master bedroom renovation project is in full swing: carpet removed, panelling pulled, plaster removed (with exception of the ceiling…tomorrow’s task), 3/4 of the lathing strips removed, and the floor is now level

When the extension was added onto the master bedroom, it was done above the front porch. The porch had a roof with a slight pitch to it, and they never leveled out the extension floor. This caused a drop of 1 3/8″ over a span of 8′ — it doesn’t sound like much, but it was really noticable. The orginal part of the room had a drop of 5/8″ over 8′.

Both sides were repectively built up using 1/4″ SurePly underlayment; 5 levels on the extension and 1 on the original part. Then they were covered with one level of underlayment. Many screws and much adhesive was used.

The end result? The floor is now level to 1/8″ on each end.

Pictures to come…

2 Responses to “the number after 2099”

  1. susannah Says:

    woooo-hoooo! :D

  2. minorthird » gettin’ busy in the bedroom Says:

    […] of a laminate, but traditional hardwood planks just wouldn’t fit, depth-wise, after I leveled the floor. We decided on the Bruce American House Series 100 in the Desert finish: The r […]

Leave a Reply